QGM QT10 Automatic Production Line for China Road and Bridge Corporation (CRBC) Dakar BRT (Bus Rapid Transit) project
The Dakar BRT project is located in Dakar, the capital of Senegal, with a total length of 18.3 kilometers. There are 23 closed bus stations on the whole line, three of which are hub interchange stations. After the completion of the project, it is expected that the average daily passenger capacity will reach 300,000, and the travel time of the whole line will be reduced from 90 minutes to 45 minutes. The comfort, safety and standardization of urban traffic will be significantly improved.
Batcher: Three Bins for Three Types of Aggregates,Each Bin is 4 Cubic.
JS750 Twin-shaft Mixer with Automatic Cement Weighing System
QT10 Automatic Block Machine:with Facemix Device, to Produce Pavers with Color Surface
Stacker with SIEMENS Frequency Control, Each Time 1 Pallet
Finished Products
Keyword: Snus Bag Packaging Machine